New Portland Facility
Building a Better Future
Advanced American Construction, Inc. (AAC), a marine contractor since 1983, consolidated all of its operations at its new headquarters facility at 8444 N.W. St. Helen's Road in Portland, Oregon in May, 2006.
The new site and the building have enabled AAC to improve and expand its award-winning service to their clients. The site and building are larger and better located, the new facilities are well-designed and state-of-the-art, and efficiency has been increased by bringing Advanced American Diving Service in Oregon City and the M. Cutter Company in Vancouver, Washington together at one facility.

Timeline
- November 24, 2004 Property Purchased
- July 20, 2005 Grading Begun
- August 17, 2005 Construction Begun
-
April 2006 Completion
-
Open May 8, 2006
Site Features
- More than seven (7) acres underneath the historic St. John's Bridge
- 1300 lf of frontage on the west side of the Willamette River
- Approved for future rail spur on the Portland and Western line.
- Two high docks
- Marina
- Boat ramp
- The site is above the 100-year flood plain.
Building Features
- Concrete tilt-up construction.
- The building is 42,700 square feet overall.
- Office: two floors, 10,540 SF total
- Equipment Repair Shop/Storage: 10,150 SF; 26-foot-clear; six large (12' by 14') drive-in service doors.
- Machine Shop & Steel Fabrication: 14,180 SF �high-bay� steel fabrication and machine shop area; two large entry doors (25' by 21') with drive-through capability; two, overhead, 15-ton bridge cranes, each with a 55-foot span..
- Covered Storage: 8,930 SF; 26- to 30-foot clear; for equipment maintenance and storage.
|